Sam George says Mahama will announce Ghana’s 5G launch before the year ends

The Communications Minister says a 5G signal should be visible from the start of 2027, after the state sold spectrum in three bands.

Ghana’s 5G launch will be announced by President John Dramani Mahama before December is out, Communications Minister Samuel Nartey George says.

Speaking in Parliament on Tuesday, the minister said phone users should pick up a 5G signal from the start of 2027.

TV3 carried his words that evening, during the debate on the 2027 Budget. The date sits beside a coverage aim 3News reported on 10 November: more than 70 per cent of the population by March 2027.

In that debate he said the state had raised US$240 million by selling spectrum across three bands: 700 MHz, 2.3 GHz and 3 GHz.

“We have sold the 5G spectrum, democratised it. We’ve raised $240 million for the Ghanaian taxpayer,” he told the House.

“November, this November, is exactly two years since the Akufo-Addo administration launched 5G. We are yet to see one 5G signal in this country,” he said.

The sale became possible after the regulator changed a licence. On 15 July 2026 the NCA removed an exclusivity condition from the wholesale 5G licence held by Next Gen Infraco Limited.

NGIC is no longer the only company that may run wholesale 5G infrastructure. The rest of its licence, including the spectrum already assigned to it, still stands.

The NCA then invited applications for those three bands. Its 11 September notice recorded a finished result in the 700 MHz band only.

Scancom Plc, the company that operates MTN Ghana, was the only qualified applicant in that band. It took two lots, at a licence fee of US$100.9 million.

The notice left 2.3 GHz and 3 GHz unfinished. Telecel Ghana and Goal Telecommunications Ltd were the qualified applicants for 2.3 GHz, and had applied for four of the five lots.

In the 3 GHz band, MTN and Telecel had between them applied for four lots, with only three available.

On 2 October, MTN told the Ghana Stock Exchange that the NCA had notified it of a 3 GHz award as well as the 700 MHz lots.

That notice to the market puts the 3 GHz fee at US$101.1 million for three lots, with both licences running for 15 years. The two fees come to US$202 million.

The NCA has not published a single total of US$240 million. George also gave no list of towns for the first signal, and no list of handsets that will connect on the first day.

He first put the March 2027 aim to the regulator in February, and told it there was barely a year to get there.

Leave a Reply

Your email address will not be published. Required fields are marked *